
Blog
Insights & Updates
Industry insights, company updates, and thought leadership from the AZROC team.
11 July 2026
Cable Bolting and Ground Support: Building Safer Underground Workings
AZROC now has full cable bolting capability, supported by our Sandvik DS420C and an experienced underground crew, strengthening our ability to deliver self-perform underground scopes.
11 July 2026
How Remote Drilling Improves Safety in Underground Mining
AZROC's Sandvik DL430 drill rig with remote drilling capability helps reduce operator exposure to underground hazards while maintaining focus on quality and productivity.
11 July 2026
What Reliable Longhole Drilling Support Looks Like Underground
Longhole drilling is a critical part of underground production, requiring experienced operators, reliable equipment, and strong coordination with the wider mining operation.
11 July 2026
Why Consistency Drives Underground Load and Haul Performance
Load and haul is a core production activity that depends on experienced operators, reliable equipment, and disciplined execution across every shift.
11 July 2026
Why Equipment Readiness Starts Before the Mine
How proactive workshop preparation and maintenance support safer, more reliable underground equipment performance.
11 July 2026
Why Preparation Is the Foundation of Safe Underground Mining
Safe and productive underground mining outcomes depend on the preparation that takes place before work begins — ground support, inspections, planning, and crew coordination.
11 July 2026
Why Underground Backfill Infrastructure Matters to Safe Production
Underground walls, paste fill systems, and barricades play a critical role in enabling stope sequencing and maintaining safe working areas. AZROC delivers practical backfill infrastructure solutions backed by experienced crews and strong safety standards.
Get in touch
Contact Us
Let's talk about your project
Whether you need underground development, production drilling, skilled crews, or equipment hire — our team is ready to discuss your requirements.


